Installation for our client at the Luas Green Line depot and stabling facilities at Sandyford. As well as the installation of walkway platforms, stairs and smash glass lockable gates, a key issue for the client was safe access to the tram rooftops for maintenance. The installation of collapsible handrails to ensure operatives could work safely without the risk of a fall was the successful result!
2018